Schematic Design
Submission of Schematic Drawing and Equipment List
M&E List
Equipment Budget Estimate
Operation Process Workflow
Hygiene Department Approval
Design Development
Submission of Kitchen Equipment Analysis
M&E Drawings
Electrical Requirement
Plumbing Requirement
HAVC Requirement
Wall ,Plinth& Recess Requirement
ID Coordination Meeting
M&E/Technical Coordination Meeting
Tender Evaluation
Evaluate Tender Submission
Tender Evaluation Report
Construction of overall control
Construction & Shop Drawings Approval
Kitchen contractor Factory Inspection
Progressive Site Inspection
Post Inspection Report
Testing and Commissioning
Testing and Commissioning
Testing and Commission Report
Tender Documentation
Value Engineering
Elevation Drawings
Equipment Specification
Tender Documentation
Kitchen contractor Shortlist and Qualification
Conceptual Design
Market Research
Market Research and Analysis
F&B Framework
Prepare Conceptual Sketches
Submission of Bulkload Estimate
Submission of Area Budget Estimate